The proportion of cement sand and water should meet the requirements and be used up within the specified time.Before plastering starts, dampen, by spraying water concrete dash coat surfaces that are to receive plaster with clean water. Check the straightness in each corner and add grout to hold the external corner beads incorrect and the internal position to be fixed.
0 Comments
Leave a Reply. |